December 4, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSXV: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) is pleased to report it has issued and filed a technical report titled “Initial Measured Lithium and Potassium Resource Estimate Hombre Muerto...
News
News
CORPORATE UPDATE
November 9, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN). The Company is providing a corporate update on progress at the Hombre Muerto North Lithium Project (HMN). NRG recently announced a National...
NRG Reports High Lithium Grades for Measured and Indicated Resource at the Hombre Muerto North Lithium Project, Argentina
HIGHLIGHTS 756 parts per million Li contained within 571,000 tonnes in the Measured and Indicated Categories Low magnesium to lithium ratio of 2.6 to 1.0 Second well pumps at 20 liters per second limited only by pump size October 3, 2018 / Vancouver, BC / NRG Metals...
NRG Announces Maiden Measured and Indicated Resource of 571,000 Tonnes LCE at the Hombre Muerto North Lithium Project, Argentina
October 2, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) is pleased to report a maiden lithium (Li) and potassium (K) resource statement for its Hombre Muerto North lithium brine project in the Salta...
Property Updates and Consulting Agreements
Sept 25, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN). The Company is pleased to announce that it has completed the third installment of its purchase option for the Hombre Muerto North Lithium Project...
Second Pump Well/Potential Production Well at Hombre Muerto North
Maiden Resource Estimated Expected Shortly September 21, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN). The Company is pleased to announce the completion of a second pumping well at the Hombre Muerto...
NRG Metals Announces Closing of First Tranche of Non-brokered Private Placement
NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES September 14, 2018 / Vancouver, British Columbia / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt OGPN), is pleased to announce that it has closed...
NRG Metals Inc. Announces Non-Brokered Private Placement
NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES September 11, 2018 / Vancouver, British Columbia / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt OGPN) is pleased to announce that, subject to...
NRG Announces Additional Results for Second Drill Hole at its Flagship Hombre Muerto North Lithium Project Second Pumping Well Started
HIGHLIGHTS NRG’s second drill hole at the Hombre Muerto North project has been completed to a depth of 280.8 m, and the sample results demonstrate that excellent lithium values are present in the lower portion of the hole. Based on these encouraging results, as well...
NRG Announces Excellent Pumping Well Test Results at Flagship Hombre Muerto North Lithium Project
August 9, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report pumping test results for the first 10 inch large-diameter pumping well at the Hombre Muerto North Lithium Project,...
NRG Announces Initial Results for Second Drill Hole at its Flagship Hombre Muerto North Lithium Project
HIGHLIGHT Initial sample results for the second core hole indicate excellent lithium values with very low Mg/Li ratios. The arithmetic average of three samples taken to a depth of 61.5 m is 719 mg/l lithium with a magnesium to lithium ratio ranging from 2.1 to 3.3....
NRG Announces Complete Results for First Drill Hole at its Flagship Hombre Muerto North Lithium Project
HIGHLIGHTS Brine samples collected from 300 to 401 meters (m) show high grade values very similar to the assays previously reported for the samples from surface to a depth of 300 m, with an arithmetic average 918 mg/l lithium and a low magnesium to lithium ratio. The...
NRG Provides Update on Drilling at the Salar Escondido Project, Catamarca, Argentina
June 27, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) is providing and update on drilling at the Salar Escondido Lithium Project. As previously announced, the second drill hole at the project was...
NRG Drilling Continues to Intersect High-Grade Brine at the Hombre Muerto North Lithium Project
HIGHLIGHTS Brine samples collected from 100 meters to 300 meters show high grade values very similar to the assays for the samples from surface to a depth of 100 meters, with an arithmetic average 888 mg/l Li and a low Mg to Li ratio. The hole has been completed to a...
Pumping Test Well at 306 Meters
HIGHLIGHTS Pumping well drilled to 306 meters Target depth set at 400 meters Geology identical to core hole May 25, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report that the...
NRG Reports Consistent High-Grade Brine Intercepts over the First 100 Meters of Drilling at the Hombre Muerto North Lithium Project
HIGHLIGHTS• Brine samples collected over the first 100 meters average 905 mg/l Li with a low Mg to Li ratio.• The hole is now at 300.5 meters in clastic sediments, and brine samples are currently being collected from 300 to 100 meters. Drilling will resume after the...
NRG Adds Second Drill at the Hombre Muerto North Lithium Project
HIGHLIGHTS• Core hole now at 222.5 meters in clastic sediments• 10 brine samples to ALS Laboratories from first hole• Second rotary drill rig added and at 153 meters• Second hole to serve for pump testing May 14, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the...
Drilling at the Salar Escondido Lithium Project Reaches 400 Meter Target Depth
May 8, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) is pleased to report that drilling at the Salar Escondido Lithium Project has progressed ahead of schedule, and an 8.5 inch rotary hole has been...
Drilling and Sampling Underway at Hombre Muerto North Lithium Project
May 3, 2018 / Vancouver, BC / NRG Metals Inc. (“NRG” or the “Company”) (TSX-V: NGZ) (OTCQB: NRGMF) (Frankfurt: OGPN) the Company is pleased to report that drilling at the Salar Hombre Muerto North lithium project is underway and progressing as planned. The first...
Drilling at Salar Escondido Approaching Target Zone
April 19, 2018 / Vancouver, BC / NRG Metals Inc. ("NRG" or the "Company") (TSX-V: NGZ.V) (OTCQB: NRGMF) (Frankfurt: OGPN.F) is pleased to announce that drilling on a second test well is progressing at the Salar Escondido Lithium Project, comprised of 29,180 hectares...