TSX-V: LIS | OTCQB: LISMF | Frankfurt: OGPQ

News

News

Select a Year a

Well Update – Corporate Site Visit – Private Placement to Close

May 29, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) May 29, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS)...

Lithium South Private Placement

May 22, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce a private placement (the “Private Placement”) of up to 10 million units (the “Units”) at a...

Preliminary Economic Assessment Filed on SEDAR

April 30, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce it has today filed on SEDAR plus, its Preliminary Economic Assessment (“PEA Report”)...

Lithium South Expands Production Well Drill Program

April 18, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company or Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce significant progress at Well PW23-AS-02 on its flagship Hombre Muerto North Lithium Project...

Lithium South Developing High-Value Alternatives in Lithium Production

April 08, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce the successful completion of a series of advanced test work aimed at exploring alternative...

Lithium South Completes 400 Meter Pumping Well at Alba Sabrina  

March 14, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) Lithium South Development is pleased to announce the completion of the first pumping well at the 2,089-hectare Alba Sabrina claim block...

Lithium South Announces PEA Estimate

US$934 Million Dollar NPV with an IRR of 31.6% and a 2.5 year Payback for HMN Lithium Project PEA HIGHLIGHTS After tax NPV of US$934 million with an IRR of 31.6% PEA based on a mine life of 25 years with a 2.5 year payback PEA based on a production rate of 15,600...

Lithium South Pumping/Production Well Drilling Update

January 18, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to provide an update regarding the ongoing development of the HMN Li Project, located on the Hombre Muerto salar, in Salta...

Lithium South Files LCE Resource NI 43-101 Technical Report

Highlights: 175% Increase in Lithium Resource 1,583,200 Tonnes Lithium Carbonate Equivalent at 736 mg/L Li 40% Projected Increase in Lithium Recovery to 70% November 6, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB:...

First Production Well Installed at HMN Li Project

October 25, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to report that the first production well at the HMN Li Project, located in Salta Province, Argentina, has been installed....

Lithium South Announces Appointment of Gordon Neal as a Director

October 12, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ) is pleased to announce the appointment of Gordon Neal as a director of the Company, effective October 6, 2023. Gordon Neal obtained...

Pumping/Production Well Installation begins at HMN Li Project

September 14, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ) is pleased to announce the initiation of a pumping/production well drilling campaign at the 5-claim block Hombre Muerto North...

175% Increase in Lithium Resource

Highlights • 1,583,100 tonnes Lithium Carbonate Equivalent (LCE) • 90% of Resource in Measured Category • Average Grade 736 mg/L Li • Low Magnesium to Lithium Ratio of 3.27 September 12, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”)...

Production Well Program Update

August 10, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ), is pleased to announce it has formalized a contract with Well Drilling of Salta, Argentina, for the provision of a two-phase program...

Production Well Program Contracted

July 13, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ), is pleased to announce it has contracted Well Drilling of Salta, Argentina, for the provision of three pumping wells for the HMN LI...

Lithium South Extraction Technology Update

June 26, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ). Given recent industry news regarding Direct Lithium Extraction technology, the Company is providing an update regarding the lithium...