PRODUCING BATTERY-GRADE LITHIUM CARBONATE

PRODUCING BATTERY-GRADE LITHIUM CARBONATE

TO MEET THE DEMAND FOR ELECTRIC VEHICLES

Lithium south development corporation

Fueling the power revolution

Slide

PRODUCING BATTERY-GRADE LITHIUM CARBONATE

PRODUCING BATTERY-GRADE LITHIUM CARBONATE

TO MEET THE DEMAND FOR ELECTRIC VEHICLES

Lithium south development corporation

Fueling the power revolution

A De-risked Quality Lithium Asset

Development Ready

with enough lithium to supply well over a Million EV’s per year

Lithium South is paving the way for electrification by advancing a high quality lithium brine resource located on the world-renowned Hombre Muerto salar in Argentina. It’s flagship project, the Hombre Muerto North (HMN Li Project) benefits from a desirable high-grade, low impurity lithium brine. With a recently completed Environmental Impact Report, the next phase for the project is a Definitive Feasiblity Study prior to a production decision. Located next to POSCO’s billion dollar lithium mine development, the HMN Li Project is poised to become a future lithium producer.

Lithium South Development Announces Completion of Phase I Environmental Baseline Study and Progress on Phases II and III

September 12, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF)...

Lithium South: Test Work – Development Work – Business Developments

August 8, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt:...

Lithium South Announces Closing of $3.9M: Non-Brokered Private Placement

June 12, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt:...

Well Update – Corporate Site Visit – Private Placement to Close

May 29, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt:...

Lithium South Private Placement

May 22, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt:...

Our Flagship Lithium Project

Hombre Muerto North

OWNERSHIP – 100% ownership, no debt

RESOURCE – 1.58 MT Li resource of high quality brine (90% measured)

GRADE – Excellent grade of 736 mg/l Li

IMPURITIES – Low magnesium to lithium ratio of 3.2 to 1

PILOT PLANT – Process test work and pilot plant underway

PRODUCTION WELL – Production well installation underway

FEASIBILITY – Feasibility Study, mid 2025

LOCATION – World-renowned Hombre Muerto salar in Argentina, surrounded by successful operators and multi-billion-dollar lithium mines

Significant Blue Sky for Lithium South

Located in the Lithium Triangle

  • 40% of global production
  • >90% of Brine Resources
  • HMN Li Project is 100% owned
  • Excellent access, infrastructure with gas and water sources
  • Project claim surrounded by Korean giant POSCO

High Grade, Low Impurities and Large Reserve Base

  • Highest grade in Argentina with 1176 Li (mg/l) on high-grade portion of the salar
  • High-grade lithium brine – 756 mg/L
  • Low Mg/Li ratio – 2.6:1
  • A high-grade, low impurity brine equates to lower capital expenditure
  • Lowest critical impurity content in the world (SO4/Mg)
  • Large M&I 1.58Mt LCE & Inferred Resources 2.3Mt LCE ???
  • Significant blue sky on high-grade resource upsize based on latest drilling results

Proven Processing

  • Similar process producing
    in the region >20 years
  • Fully functional laboratories,
    expanded pilot scale ponds and
    enhanced pilot plant
  • HMN Li Project pilot plant producing
    battery grade lithium carbonate

Outstanding Results

  • Pre-feasibility Study completed & Full Feasibility ongoing
  • 20ktpa LCE production with post-tax PFS results of US$9.34M NPV8%, ~31.6% IRR and payback of <2.5 years
  • Significantly undervalued against peers

Best in Class

  • Low impurity = Low OPEX
  • US$2,914/t OPEX is lowest quartile in the industry
  • High grade = Low CAPEX
  • ~US$16,000/t CAPEX intensity is the lowest of any greenfield development

Proven Team / Permits

  • Strong local technical lithium experience
  • Fiscal stability in the place
  • Permits in place
  • EIA imminent
  • Strong w/c and best in the class institutional ownership

CEO CORPORATE UPDATE

Adrian Hobkirk, CEO of Lithium South shares Company Overview on September 12, 2023.

HOMBRE MEURTO NORTH Li PROJECT

Aerial view of Alba Sabrina – the largest claim block at 2,089 hectares.

Lithium South HMN Li Project - lithium evaporation ponds on Alba Sabrina claim block in Salta, Argentina.

Conceptual Rendering of Evaporation Ponds on Alba Sabrina Claim Block

Lithium South has advanced the HMN Li Project towards production

ACQUISITION

November 8, 2017

Lithium South (formerly NRG Metals) completes acquisition of Hombre Muerto North Lithium Project (HMN Li Project) and issues options.

Lithium Resource Expansion Success

September 12, 2023

The 2022-2023 resource expansion program is comprised of a total of eight core wells, seven were drilled on the Alba Sabrina Claim Block, the largest in the project package at 2,089 hectares. Combined with the newly completed hole NM01 at the Natalia Maria Claim Block, and the 2018 drill program at the 383-hectare Tramo Claim, over 75 % of the salar located claims has now been drill tested.

AS01 hole – 300 meters, 722 mg/L lithium average
AS02 hole – 410 meters, 633 mg/L Lithium average
AS03 hole – 260 meters, 663 mg/L Lithium average
AS04 hole – 270 meters, 734 mg/L lithium average
AS05 hole – 220 meters, 705 mg/L lithium average
AS06 hole – 180 meters, 644 mg/L lithium average
AS07 hole – 180 meters, 644 mg/L lithium average
NM01 hole – 375 meters, 1176 mg/L Li average, Natalia Maria claim block

High-Grade Lithium Brine Results

April 6, 2024

April 06, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ). Lithium South Development is pleased to announce outstanding results from the Natalia Maria claim block at the Hombre Muerto North (HMN) Lithium Project, located in Salta Province, Argentina. High-grade lithium results have been encountered in exploration core hole NM01. Brine samples collected from NM01 have an average lithium grade of 1176 mg/L Li and a low magnesium to lithium ratio of 2.66.

With the compilation of final results from the drill program, the Company looks forward to the full program results and to the delineation of an updated lithium resource. The high-grade lithium results across seven holes at Alba Sabrina, as well as the very high-grade lithium samples from Natalia Maria, demonstrate the potential of the HMN Li Project.

Preliminary Economic Assessment Filed on SEDAR

April 8, 2024

Lithium South successfully produced a bulk lithium carbonate (Li2CO3) product, showing potential for purification to battery grade quality. This route, integrating boron solvent extraction, achieved an overall lithium extraction efficiency of 60%. Subsequent purification tests conducted by SGS Canada Inc. indicated that the bulk lithium carbonate product achieved purity levels ranging from 99.4% to 99.5%, approaching the desired battery grade specification. The lithium carbonate purity reported herein is defined based on the difference versus both the “Sum of impurities” and “Loss of ignition at 550°C”.

While the primary plan remains to produce Li2CO3 technical grade with a 70% efficiency, using the industry proven evaporation technique, these test results demonstrate Lithium South’s capability to adapt and potentially shift towards higher value products. The company is excited about the flexibility these alternatives offer, which could significantly enhance the project’s value without altering the current production strategy.

Production Well Drill Program

April 18, 2024

April 18, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company or Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce significant progress at Well PW23-AS-02 on its flagship Hombre Muerto North Lithium Project (“HMN Li Project”), which is the first pumping well to be located at the Alba Sabrina claim block. Spanning 2,089 hectares, Alba Sabrina is the largest claim block in the HMN Li Project package and a key component of the corporation’s lithium development efforts.

Recent efforts at Well PW23-AS-02, have successfully cleared the well of sediment, leading to the flow of clear brine with strong artesian characteristics. These developments suggest potential for enhanced brine extraction rates. To maximize these benefits, an 80-kilowatt pump, significantly larger than the initially planned 50-kilowatt pump, has been contracted for the HMN Li Project.

Adrian F. C. Hobkirk, President and CEO of Lithium South Development Corporation states, “These developments on the Alba Sabrina claim block could potentially enhance our operational capacity.  The completion of this pumping test, anticipated by the end of May, will provide critical technical insight into the capacity potential of this area of the salar.  We’re excited about the future and are committed to delivering value to our shareholders and contributing responsibly to the global energy transition.”

Preliminary Economic Assessment Filed on SEDAR

April 30, 2024

The 2024 PEA Report provides support for Lithium South to proceed with development plans for a 15,600 tonnes per year lithium carbonate plant, located at its wholly owned, Hombre Muerto North Lithium Project (“HMN Li Project”) in Salta, Argentina. The extraction and recovery process for the project is based on conventional solar evaporation of the well brine, magnesium removal with slaked lime and lithium carbonate precipitation using soda ash, which is an industrial proven method of lithium production.

The financial model shows a Net Present Value after tax of US$938 million, an after-tax Internal Rate of Return of 31.6%, and a 2.5-year payback.

Environmental Baseline Study – Phase I Complete

Sept 12, 2024

September 12, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce the successful completion of Phase I of the Environmental Baseline Study for the Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province, Argentina. The report was completed by Knight Piesold Consulting (Argentina), a global engineering firm. The evaluation has taken 18 months and represents an important step for moving the project towards development.

The report presents comprehensive data pertaining to hydrology, hydrogeology, soil quality, flora and fauna, landscape and socio-cultural impact. The report establishes an environmental baseline from which the Company can further develop the project to an anticipated production rate of 15,600 tonnes per year of lithium carbonate using industry standard evaporation. This report will be key to the completion of an Environmental Impact Report seeking permissions to construct the mine.

Production Pilot Plant

March 2025

September 12, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce the successful completion of Phase I of the Environmental Baseline Study for the Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province, Argentina. The report was completed by Knight Piesold Consulting (Argentina), a global engineering firm. The evaluation has taken 18 months and represents an important step for moving the project towards development.

The report presents comprehensive data pertaining to hydrology, hydrogeology, soil quality, flora and fauna, landscape and socio-cultural impact. The report establishes an environmental baseline from which the Company can further develop the project to an anticipated production rate of 15,600 tonnes per year of lithium carbonate using industry standard evaporation. This report will be key to the completion of an Environmental Impact Report seeking permissions to construct the mine.

Feasibility Study Complete

May 2025

September 12, 2024 / Vancouver, BC / Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce the successful completion of Phase I of the Environmental Baseline Study for the Hombre Muerto North Lithium Project (HMN Li Project), located in Salta Province, Argentina. The report was completed by Knight Piesold Consulting (Argentina), a global engineering firm. The evaluation has taken 18 months and represents an important step for moving the project towards development.

The report presents comprehensive data pertaining to hydrology, hydrogeology, soil quality, flora and fauna, landscape and socio-cultural impact. The report establishes an environmental baseline from which the Company can further develop the project to an anticipated production rate of 15,600 tonnes per year of lithium carbonate using industry standard evaporation. This report will be key to the completion of an Environmental Impact Report seeking permissions to construct the mine.

LITHIUM SOUTH VALUE PROPOSITION / 1.58 MT LCE High Quality Brine

  1. 175% resource expansion
  2. 1.58 MT tonnes Lithium Carbonate Equivalent (LCE)
  3. 90% of Resource in Measured Category
  4. Average Grade 736 mg/L Li
  5. Low Magnesium to Lithium Ratio of 3.27
  6. HMN Li Project owned 100% on Hombre Muerto Salar
  7. Located in mining-friendly, Salta and Catamarca Provinces
  8. Strategically located near successful operators and major lithium mines, representing a significant undeveloped opportunity in the region.
  9. The project is surrounded by successful operators and multi-billion-dollar lithium mines and may be one of the last undeveloped major land plays in the region.
POSCO

US $4 Billion lithium development next door

Recent Lithium Acquisitions – Hot M&A Market

Millennials Lithium

Millennial sold to Lithium Americas for
US $400 million

Neo Lithium

Neo Lithium sold to Zinjin Mining for
CAD $960 million

Rincon Lithium

Rincon Mining sold to Rio Tinto for
US $825 million

LSC Lithium Corporation

Lithea Inc. sold to Gang Feng for
US $962 million

Galaxy Lithium

Galaxy sold to Posco for US $280 million

Arena Minerals

Arena Minerals sold to Lithium Americas for US $227 million

CEO Statement

We are now arriving at an important milestone for the HMN Li Project, the filing for construction permissions. The Company is moving this process ahead in conjunction with completing a Definitive Economic Assessment. During this process, the project may be further enhanced in throughput size, exceeding the 15,600 tonnes per year recently published in our Preliminary Economic Assessment. We look forward to completing the required engineering and well drilling on a fast-track basis.

Adrian Hobkirk, President & CEO of Lithium South